The Resources Manager acts as an « electronic catalogue » of the various cost elements at project level. It also allows the estimator to add, modify, copy and use resources in order to detail item costs.
The main features are:
- Basic Resources (Equipment, Labour, Material, Bulk, Miscellaneous and Subcontractor);
- Compound Resources (Task/ Assembly, Crew and Material List);
- Equipment Resources with plugged or detailed rate (operators, fuel, depreciation etc.);
- Task/assembly Resources that can be used as sub-items representing standard operations or Item work phases;
- Search and Replace tool;
- Definition of resources payable according to different foreign currencies;
- Multiple modifications tool allowing for the simultaneous modification of one or many resources;
- Bidirectional transmission of costs between reference projects and general databases;
- Tool for visualizing the resource distribution within a project.
|